Spring 2027 outages are being planned now, and casing tooling is one of the things that cannot arrive late. When two units of the same model open the same week, whoever asks first keeps the kit.

What we have in Texas
| Kit | What it does | Kits |
|---|---|---|
| GE D11 | Temporary hydraulic closure of the steam casing for tops-on readings: 60 nuts from 2½ to 7 inches at 2,500 bar | 2 |
| GE 7FA | Casing bolt tensioning: tensioners 1 to 2¼ inch, 1,500 bar pump, body-bound bolt pullers | 4 |
| GE 7EA | Casing bolt tensioning: tensioners 1, 1¼ and 1¾ inch, 1,500 bar pump | 2 |
| Siemens 501F | 4-way joint solution, installed by our crews | Crews |
Two ways to rent
- Rental only: calibrated kit, pressure-test certificates and packing list; your crew runs it.
- Tool plus field advisors: our people arrive the day before casing work, with the kit checked and hoses laid out.
Five things we ask for
Unit and revision, bolt schedule and joint drawings, outage window and sequence, who handles crane and rigging, and site access rules. With that we send back a one-page scope ready for the outage manager.
Rental page with inventory and FAQ · GE D11 · GE 7FA · GE 7EA
Reserve your dates
Send unit and window; we confirm within one business day. Texas, Mexico and Canada.