GE 7FA Casing Bolt Tensioning — Faster Outages, Cleaner Joints

Boltight hydraulic casing tool kits and trained TFA crews ready to mobilize for your next CI, HGPI or Major Inspection. Four kits standing by in Laredo, TX.

Request a Quote — 7FA
Fixed-price within 1 business day

Why hydraulic on a 7FA outage

The GE 7FA is the workhorse of the US combined-cycle fleet. Every Combustion Inspection, every Hot Gas Path Inspection, every Major — the casing has to come off and go back on, with bolt loads that conventional torque can’t deliver evenly.

Impact and torque-only methods stretch studs unevenly, mark the joint surfaces and create misalignment that costs you on the next inspection. Hydraulic tensioning loads every stud uniformly, in parallel, and leaves the joint ready to seal on first re-light.

We bring the kit, the pump, the body-bound bolt pullers and the operators. You get the casing closed faster and cleaner.

Boltight GE 7FA Gas Turbine Casing Tool Kit with tensioners and pump unit

What’s in the 7FA kit

Each of our four 7FA Casing Tool Kits is a complete Boltight system, configured for the 7FA bolt range:

Tensioners (1″–2-1/4″ 8UN)

  • TCT-1000-21-00 · 1″ 8UN
  • TCT-1250-21-00 · 1-1/4″ 8UN
  • TCT-1500-21-00 · 1-1/2″ 8UN
  • TCT-1750-21-00 · 1-3/4″ 8UN
  • TCT-2000-21-00 · 2″ 8UN
  • TCT-2250-21-00 · 2-1/4″ 8UN

Power & ancillary

  • BT-1506 air-driven 1500-bar pump
  • 4 m and 8 m link hoses
  • Tee blocks for parallel tensioning
  • Long-bridge assembly for 1-3/4″
  • Assembly & impact sockets (35–77.5 mm A/F)

Body-Bound Bolt Puller set

  • Pullers 1-1/4″ to 2-1/4″ 8UN
  • Bolt caps, safety strap, hand pump
  • Reamer-bolt extraction on request

All tools pressure-tested with calibration certificates. Custom transport case for road-ready logistics.

Our scope of work

Day 1 — Mobilization & inspection

  • Site safety induction with your HSE team
  • Inspection of bolts, studs and Superbolts
  • Boltight tensioner installation per Nord-Lock procedure

Day 2 — Hydraulic operation

  • Hydraulic pump and manifold setup
  • Sequenced tensioning per 7FA closure procedure
  • Real-time pressure monitoring and stretch verification

Day 3 — Closeout

  • Final tension verification
  • Protective caps placement
  • Tool packing and demobilization
  • Service report with documented torque/tension values

Crew: 4 TFA technicians on-site  ·  Mobilization: 48–72 hours from Laredo, TX  ·  Coverage: continental US

Compatible 7F variants

7EA frame requires our separate 7EA kit — see 7EA service.

Outage scheduling

We block kits and crews on first-confirmed-PO basis. Outage windows in Q2 and Q4 fill fast — engage early to lock your dates.

Get your 7FA outage kit-ready.
Fixed-price quote in 1 business day.

Request a Quote

Frequently asked questions

Can you work alongside our prime contractor?

Yes. Our scope is the casing tensioning operation — your prime keeps overall outage coordination, crane services and disassembly/reassembly outside the bolt scope.

Do you supply consumables (lubricants, anti-seize)?

Yes, included in the fixed-price quote.

What if our bolts are non-standard or oversized?

Send us the bolt schedule before the PO. The kit covers 1″ to 2-1/4″ 8UN — anything outside that range, we’ll evaluate before the visit.

Do you provide pre-outage planning support?

Yes. Our TFA lead reviews your unit history and casing schedule before mobilization.

What documentation do we receive?

Pre-job safety pack, calibration certificates, real-time pressure logs, and a final service report with as-found/as-left conditions and torque/tension values.