
Houston Ship Channel
Baytown · Channel · Pasadena · Deer Park, Texas · United States
- 2025501F 4-way joint solution installed on three gas turbines in Baytown, plus Channel and Pasadena; leak investigations on site. Read more →
- 2025Expansion bolts on a steam turbine coupling in Baytown. Read more →
- 2026New 4-way joint installations in Pasadena, Deer Park and Channel, and in Baytown during a hot gas path inspection.
- BaseCleveland, Texas: 8 Boltight casing kits in stock (2 D11, 4 7FA, 2 7EA). In 2026 a D11 closure kit went out on rental with field advisors, and 501F hydraulic tensioners. Read more →


















