News

From the field.
Installations, cases and how things work.

What we install, where and with what result: offshore platforms, turbine casings, natural gas stations and the people who do the work. Real numbers, real photos.

Kit rental

Boltight casing kits available for the spring 2027 outage season

Spring 2027 outages are being planned now. In Texas we have 2 GE D11 kits, 4 GE 7FA kits and 2 GE 7EA kits, plus crews for the Siemens 501F 4-way joint. Also in Mexico.

Read the story
Field cases

Expansion bolts on a steam turbine coupling in Baytown, Texas

Fitted coupling bolts are tight on purpose; the problem comes when they have to come out. In 2025 we installed expansion bolts on a steam turbine in Baytown, Texas: they go in and come out without seizing.

Read the story
Field cases

Superbolt for boiler feed and circulating pumps at CFE Carbón II

Two contracts awarded by CFE, 2022 and 2023: Superbolt multi-jackbolt tensioners supplied and installed on feedwater and circulating pumps at the Carbón II power plant in Coahuila.

Read the story
Natural gas

The complete natural gas station, built in Mexico with INOVA

Pig traps, filtration, metering and pressure regulation: four skids that together make a gas station. INOVA builds them in Santa Catarina, N.L., and we take them to projects in Mexico.

Read the story
Kit rental

Renting 7FA/7EA casing bolt tensioning tools vs buying: a cost and lead-time view

Casing tooling works a few days per outage cycle. What buying really includes, how rental turns it into per-project line items, and when each option makes sense.

Read the story
How it works

501F 4-way joint reinstall: what a plant should expect during an outage

From the pre-job review to the as-left report: the four steps of the Nord-Lock / Superbolt 4-way joint reinstall on a W501F, what stays with the prime, and what the plant receives.

Read the story
How it works

How hydraulic casing closure works on GE D11 steam turbines (and why locking collars matter)

How a hydraulic closure system closes the D11 upper shell for clearance and distortion readings, and why the locking collar on each hydraulic nut makes the readings trustworthy.

Read the story
Field cases

35 installations of the 501F 4-way joint solution in North America

From April 2025 to June 2026 our crews installed and re-installed the 4-way joint solution on 35 occasions on W501F FD3 and FD4 units in the U.S. and Canada, without extending the outage.

Read the story
Field cases

From 48 hours to 8: Superbolt on PEMEX offshore compression modules

Every leak at start-up meant re-tightening and deferred production. With multi-jackbolt tensioners, maintenance on critical offshore equipment dropped from 48 hours to 8, with 15 consecutive interventions and no failures.

Read the story
Team & events

The whole GIMAN team in Monterrey for 501F training

February 17–20, 2025: the team from Vancouver, Houston, Villahermosa and Mexico City met in Monterrey for specialised training on Siemens 501F turbines and the solutions we install.

Read the story
Team & events

GIMAN at POWERGEN 2025 in Dallas

February 11–13, 2025: we walked POWERGEN in Dallas to see what is new in power generation and to talk with the plants and contractors that run outages in North America.

Read the story
Field cases

Quality supervision of the Nord-Lock solution on a Siemens 501F in Puebla

February 2024, San Lorenzo Potencia, Puebla: we supervised the quality of the Nord-Lock solution with mechanical tensioners on a Siemens 501F casing. It was the start of what became 35 installations in North America.

Read the story
Field cases

Superbolt tensioners at the Dos Bocas maritime terminal

December 2023, Paraíso, Tabasco: we installed Superbolt mechanical tensioners on terminal joints that cannot leak, tightened with a hand wrench, without hammer wrenches or hot work.

Read the story
Natural gas

Rehabilitation of the gas line at a combined-cycle plant in Campeche

October 2024: we took part in rehabilitating the gas line that feeds a combined-cycle plant in Campeche. Without fuel gas at the right pressure and cleanliness, the plant does not run.

Read the story

We don’t box the leak. We close the joint.

Contact

Want your project to be the next story?

Tell us the job and the date. We answer within one business day.

info@giman.com · +1 832 408 9841 (WhatsApp)
Cleveland, Texas · Mexico · Canada

¡Contáctanos!